LCL
|
Lower control limit of a Control Chart calculated based on the average range (within subgroup) and the grand mean (between subgroup) of the data.
|
|
Lead-Time
|
The total time a customer must wait to receive a product after placing an order.
|
|
Lean
|
Removal of non-value added activities (8 Wastes) resulting in improved delivery of product or service at the most efficient return on investment.
|
|
Line Balancing
|
Balancing of Cycle Times at each operation to be less than or equal to Takt Time.
|
|
Linearity
|
A measure of deviation from a linear relationship between two variables, or the issue of Linearity, where a measurement system has changing variation across its usable range of measure.
|
|
LSL
|