Glossary

Symbols & Numbers
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

L

LCL

Lower control limit of a Control Chart calculated based on the average range (within subgroup) and the grand mean (between subgroup) of the data. 

Lead-Time

The total time a customer must wait to receive a product after placing an order.

Lean

Removal of non-value added activities (8 Wastes) resulting in improved delivery of product or service at the most efficient return on investment.

Line Balancing

Balancing of Cycle Times at each operation to be less than or equal to Takt Time.

Linearity

A measure of deviation from a linear relationship between two variables, or the issue of Linearity, where a measurement system has changing variation across its usable range of measure.

LSL

Lower limit of the engineering specification – independent of the control limit of a process.

 

Home | About Us | Services | Methods | Free Tools | Calendar | Contact Us
Clients | Books & Articles | On-Site Training | Booking | Public Seminars | Newsletter | Links 

© Copyright 2007, all rights reserved

Privacy Policy/Terms of Use

Site Map

web design by CMF Web Works

 

ProgressivEdge
27475 Ynez Road, #372
Temecula, CA 92591
619.244.8705